Road marking machine after using how clear is better


Release time:2019/3/11 11:38:58 Source:www.theshadecloth.com/

Abstract:Line width: road marking machine is now the international road marking standard width is 15 cm, but you need to take into account the marker may also be in the parking lot and the site use, such as this

Line width: road marking machine is now the international road marking standard width is 15 cm, but you need to take into account the marker may also be in the parking lot and community site use, then you should buy a marker of width adjustment function, can reasonably use and save the paint. Line spray sand pavement marking removal machine, different types and particle size can be achieved by controlling the sand removal effect, for normal temperature reticule and rough pavement marking in the groove of the removal of more effective. Since easy to generate a lot of dust when sand blasting, so that the work should be an external vacuum cleaners, realizing the clean construction. Or by adding liquid medium in the abrasive, can also be very good to reduce dust pollution of sand. In order to achieve a better cleaning effect, spray sand pavement marking removal machine slower walking speed, the efficiency is low, so often used in the line of the workload is small, the number of cars less. Blasting QingChuFa QingChuFa by blasting shot blasting equipment to realize the line.

 

 
1. Its working principle is: the body of the motor to drive the impeller rotation, the effect of line by centrifugal force, the pill blasting machine material (steel shot or sand) and certain Angle ejection at high speed to work on the surface, make pill is expected to impact working surface, then the airflow inside the machine through the form a complete set of vacuum cleaning, the pellet material and clean up the dust separate impurity recycling, recycling of pill has been repeated circulation mass ejection, in order to clear the pavement marking.
 
2. In a driving type marking machine can construction of 10 km per hour on average, and a push is marking machine work 8 hours a day 5 or 6 km to construction. Take a 100 km highway for example, the type marking machine with ride spend a day with a little work is finished, of course, it is an ideal state, the ruling machine actual construction may take more time, we will put some 3 days long; And traditional hand push type marking machine in 3 days to finish the 100 km line project, even with five hands push type marking machine at work overtime together may not finish.
 

Please indicate the source of the reprint://en/news/3641.html。

Contact us

Get in touch with us. Please use the following contact at will.

Enter Your name
Please enter your mailbox account
Fill out your message here
Send success
I'm sorry, your sending is wrong.

Address:Shangdang town of Dantu District,Zhenjiang City,Jiangsu Province,China Telephone:+86 13852907688  [email protected] www.theshadecloth.com/