Work speed: in addition to glue or 800-1000 - m squared/h
Engine: weifang weichai power (according to Mr. Tao) six-cylinder 2 emissions
Power: 255 kw
Speed: 1800 r/min
Pump speed: 500 times per minute
Pressure: 1400 bar
Traffic: 85 l/min
Plunger: carbide 26
High pressure seal: imported high quality seal
Forced lubrication system and oil cooling system, imported high quality safety blasting diaphragm
Full computer monitor instrument box: the oil temperature alarm, water temperature alarm, engine speed, hydraulic size, voltage display hours of work, machine breakdowns, hydraulic precision voltage regulator
Booster pump: front biggest booster pump pressurized 6 kg
Stainless steel vertical filter layer filter: the secondary filter
Protection of water supply system: including low voltage protection system of water supply
Recovery system: sino-japanese joint venture ZhangHuang vacuum pump, the pressure to 0.4 bar
Tank: about 6 t clear water tank, sewage tank customized according to the model
Tank: 250 l
Equipment integrated with integrated enclosure cover and can be easily separated from the cars
Ramp control: walk at a constant speed controller (without human control) the minimum speed is 5 m/min can with auto gear shift can cruise control
Car remote monitoring system of bridge (the driver in the driving room can be removed by video image real-time monitoring in addition to the line of car marker) matching
In addition to the rubber head for ha mollmann rotator (3 group 1 meters wide 48 tip)
Host size: 3 m * 2.2 m * 2.25 m overall dimensions can be customized according to the model
Net weight: 7 t (excluding trucks)
Click to download the file click to download the file
Get in touch with us. Please use the following contact at will.